If week after week your production plans are not respected, or orders are delayed despite everyone’s efforts, the issue is very often not “lack of work” or inefficient staff. In most cases, the real problem lies in production bottlenecks.
What is a production bottleneck?
Simply put, a production bottleneck is a point in the process that slows down or limits the entire line because it cannot operate at the same speed as the other stages.
The term comes from the shape of a bottle: the narrow neck is where the flow is forced to slow down before exiting.
When incoming workload exceeds the capacity of a machine or a specific process step, a queue of activities builds up. As a result, the entire production cycle stretches out and planning becomes inaccurate.
Why production plans don’t match reality
When production plans are misaligned with actual results, the causes are often related to:
Errors in production time calculations
Production planning usually starts with an estimate of production times—how long each operation is expected to take. However, these estimates often fail to reflect actual production times, meaning the real time machines and operators spend on each task.
Even small discrepancies accumulate throughout the process, leading to increasingly inaccurate plans.
Incorrectly defined machine cycle times
Not all machines work at the same speed. A single slower machine can become a bottleneck, even if all other stages are efficient.
This means your scheduler cannot generate reliable plans unless it accounts for real machine cycle times—the actual time required to complete one unit or batch.
Dynamic changes in production
Bottlenecks are not static. A machine that is a bottleneck during one shift may not be during another. This makes forecasting and scheduling even more complex.
That’s why it’s essential to have a system that automatically updates and recalculates production times based on real conditions.
What is cycle time and why it matters
Machine cycle time is a key metric that measures how long a machine takes to complete the processing of a part or a batch.
Comparing actual cycle time with estimated cycle time is one of the most effective ways to identify where production bottlenecks occur.
When one stage has a significantly longer cycle time than the others, it is very likely limiting the overall capacity of the production line.
The limits of “theoretical” planning:
- Planning based on expected data rather than measured data often leads to:
- Incorrect production time estimates
- Over- or under-utilized resources
- Missed delivery deadlines
- Unexpected scrap and costs
This happens because traditional scheduling systems do not always take real shop-floor data into account—such as cycle times, machine downtime, or performance variations—resulting in overly optimistic and unrealistic plans.
One of the first steps to avoiding production bottlenecks is collecting reliable, up-to-date data directly from the shop floor:
- Calculate production times based on real measurements, not assumptions
- Track actual production times for each machine and operation
- Analyze cycle times to quickly identify where inefficiencies arise
The role of technology: real-time data and AI
Digitalizing production with AI, Industrial IoT, and intelligent dashboards makes it possible to:
- Visualize real cycle times and production times
- Automatically identify bottlenecks
- Adjust planning using up-to-date data
- Improve forecasting accuracy
- Reduce manual errors and waste
With technologies like Zerynth, production can be monitored in real time, allowing bottlenecks to be identified immediately and planning and scheduling to improve through live data.
Zerynth’s cycle time optimizer also uses intelligent algorithms to calculate the ideal cycle time based on historical data, helping define realistic and adaptive operational benchmarks that reflect actual factory conditions.
Production bottlenecks are not individual failures—they are symptoms of a lack of visibility into real shop-floor data. Without a clear understanding of machine cycle times and actual production times, any scheduling effort risks remaining disconnected from operational reality.